mirror of
https://github.com/mauriceboe/TREK.git
synced 2026-10-20 14:06:27 +00:00
d72352911e
A saved tour now has a technical revision, raised inside the transaction of
every write that changes it: the route and its controls, the plan laid onto a
recorded paddle track, going back to that track. A write that names the
revision it was based on (expected_revision) is refused with a 409
{ code: 'tour_revision_conflict', revision } before anything of it is
written, so a stale draft never overwrites a newer tour unseen. A write that
names none writes as before, so older clients and queued offline writes keep
working; the queue never carries a base. A copy starts at 1, a source's
version stays provenance. Migration 044800 adds the column; list_tours and
get_tour_plan read it.
The editor follows the trip's tours live: a newer revision of the open tour
loads at once while the editor has no changes of its own, and shows a notice
while it has. A refused save keeps the draft and asks: save it as a new tour,
load the newer version, or overwrite on purpose.
useTourPlanner was at the size limit; its derived facts, undo history and
draft storage move into tourPlannerFacts, usePlannerHistory and
useTourDraftStorage, unchanged in behaviour.