Commit Graph

3 Commits

Author SHA1 Message Date
Maurice d2e044869a fix(days): a day without a date keeps no date when it is moved, so it can go to the front of a dated trip
Reordering handed out the dates by position, so moving a day added without a
date to the front gave it the first date and took the date of the last dated
day. The undated row stayed at the end and the move looked like it did
nothing, by drag and by the arrows alike. The dates now go to the dated days
only, in their new order; the rule lives in shared so the server, the
planner's optimistic list and the MCP tool apply the same one.
2026-10-10 21:34:51 +02:00
Maurice 1b63285ad0 feat(trips): shortening a trip says first which days go and what is on them
The trip dialog on the desktop and the trip sheet on a phone now ask before a save whose new dates remove days with something on them. The question names those days the way the day list does and lists what goes with them in the same rows the delete day question uses: planned places stay in the place list, notes and day texts are deleted, bookings stay under Bookings, and a stay that checks in or out on a removed day goes as a whole while its booking and expense remain, shown in the danger tone. A moved start gets both questions in one step, with the booking hint following the chosen shift mode, and a save that only drops empty days asks nothing.

The rule that lays the days out moved into shared as planDayGrid, with resolveDayGridRange deciding whether the rows are rebuilt at all. generateDays on the server now carries that plan out in one transaction, so the warning names exactly the days the save takes, and a seeded fuzz test holds the new rebuild to the old one over 300 random day grids. The update_trip tool says in its description what shortening takes and lists removed_days in its answer.

Alongside, the dialog sends a day count only when it changed, so a stale count no longer trims a day just added, stays are reloaded after every date change including the one made on a phone, and the date shift tip now points to adding a day under Reorder days.
2026-09-23 22:40:46 +02:00
Maurice b56f335978 feat(dayplan): a day can be added with the next date, which extends the trip by one
On a trip with dates the reorder dialog and the days sheet on a phone now offer two ways to add a day: a day without a date at the end as before, or the calendar day after the last date, named on its button, which extends the trip by one day. The new day goes right behind the last dated day, so the days without a date move one place back with their plans, and no existing day or booking changes its date.

The server does it in one transaction behind a new dated flag on the day create contract, used by REST, the create_day tool and the plugin RPC alike. It moves the road trip boundaries of the days behind the new one, and announces the day with day:reordered and the grown trip with trip:updated; an insert at a position announces its trip now as well. The next date and the day limit come from one shared rule, so the button never promises a date the server would not give.

On the client the add is online only and runs one at a time, so a double click cannot grow the trip by two days. A wiring test that picked the stay question by its position now finds it by its handler, since the delete question sits in front of it.
2026-09-23 22:40:46 +02:00