The confirmed field is checked through z.object(...).pick() as the dawarich
and doc-sync tests read their tool shapes, and the stage edits pass typed
waypoints through the request contract as the walk tests do. The previous
forms sent the test typecheck out of memory.
Raw request bodies are objects, the collection snapshot names the run, ski,
winter and track time fields, the walk write says it has no hiking limit,
the MCP field shapes are read as zod shapes, and the stage edits go through
the tour request contract the API parses them with.
Types, test expectations and helpers the seven tracks each changed on their
own, brought in line with the integrated code. tours.service.ts and the tours
repository grew past the size limit with every track and hand their row and
write helpers to modules of their own.
A save refused by the rules of the tour now says "Nothing was saved and
nothing changed." instead of the preparation's wording: lay() takes what
the changes are laid for, and refusalText() leads with that action.
A save sent again after it committed (a retry after a lost answer) used
to meet the conflict of a tour that moved on, which tells the assistant
to prepare the change anew, so an add could be saved twice. The save now
looks up the step its proposal was saved as from the revision it was
prepared on, before the stale check and once more inside the write, and
answers already_saved with that step instead, writing nothing.
An assistant can now save the change prepare_tour_change prepared, once the
traveller said yes to it exactly as shown. Until now a proposal could only
be looked at; the traveller had to redo it by hand in the planner.
- The save names the proposal: the same changes, the revision it was
prepared on, the proposal_id the preparation answered and confirmed true.
Anything else, a change altered on the way or no yes, is refused and
nothing is saved.
- Place editing on the trip and the tour are checked again before anything
is written. A tour changed since the proposal was prepared is a conflict
on the tour's one revision (no second one), telling the assistant to
prepare the change anew instead of writing over newer edits. The changes
are laid on the saved tour once more inside the write, so a station
visited or skipped meanwhile, or a place of the trip gone, refuses the
save with every reason.
- The change goes through the write the planner's save uses, in one
transaction: line, stations, keys, measures and visits together or not at
all, and the trip is told only after the commit. Stations kept keep their
keys and visits. Where the router gives no way on foot the walk keeps its
stations only and waits for the planner, as a created one does.
- Every save is kept as a step of the tour (tour_change_steps): the
proposal, the revision it was prepared on and the one it raised the tour
to, the changes and the tour as it was before them, so the step can be
followed and taken back later. Nothing of the conversation is kept.
- A new walk has no revision to name and stays with create_city_walk; both
tool descriptions and the wiki say which is which.