An assistant can now take back a change it saved with save_tour_change,
the way the change was saved: listed, shown, then taken back only after
the traveller said yes. Until now a saved step could be followed but not
undone; the traveller had to rebuild the walk by hand in the planner.
- list_tour_change_steps lists the steps of a tour, the latest first, with
the changes as confirmed and where each stands: latest, undone, later
change on top or no readable earlier state. Planner saves are no steps.
- prepare_tour_undo shows what taking a step back does without writing
anything: the tour now, with the stations visited or skipped, set
against the tour exactly as the step kept it, the stations kept, coming
back and removed, and the distance and walking time stored then.
- undo_tour_change restores that tour whole or not at all, through the
write the planner's save uses: line, stations with their keys and the
measures stored then, in one transaction with the mark on the step, and
the trip is told after the commit. It needs place editing on the trip
and checks everything again inside the write.
- Only the tour's latest change goes back. A step something was saved on
top of since, in the planner or by another step, is a conflict on the
tour's one revision (no second one), so no later edit is lost unseen; a
preview read at another revision is a conflict too. Taking back a step
that would remove a station visited or skipped since, or bring back a
station whose place of the trip is gone, is refused with every reason,
and so is a step without a readable earlier state. Every refusal and
failure leaves the tour as it is.
- A step is taken back once: tour_change_steps records the revision that
raised the tour to, who confirmed it and when, and nothing else is kept.
- None of it touches a planner draft: the planner's own undo stays in the
browser, and discarding a draft never changes a saved tour. The tool
descriptions and the wiki say so.
The write of a tour's line and points and the tour as the answer gives it
now come from one place for the save and the undo.
An assistant can now save the change prepare_tour_change prepared, once the
traveller said yes to it exactly as shown. Until now a proposal could only
be looked at; the traveller had to redo it by hand in the planner.
- The save names the proposal: the same changes, the revision it was
prepared on, the proposal_id the preparation answered and confirmed true.
Anything else, a change altered on the way or no yes, is refused and
nothing is saved.
- Place editing on the trip and the tour are checked again before anything
is written. A tour changed since the proposal was prepared is a conflict
on the tour's one revision (no second one), telling the assistant to
prepare the change anew instead of writing over newer edits. The changes
are laid on the saved tour once more inside the write, so a station
visited or skipped meanwhile, or a place of the trip gone, refuses the
save with every reason.
- The change goes through the write the planner's save uses, in one
transaction: line, stations, keys, measures and visits together or not at
all, and the trip is told only after the commit. Stations kept keep their
keys and visits. Where the router gives no way on foot the walk keeps its
stations only and waits for the planner, as a created one does.
- Every save is kept as a step of the tour (tour_change_steps): the
proposal, the revision it was prepared on and the one it raised the tour
to, the changes and the tour as it was before them, so the step can be
followed and taken back later. Nothing of the conversation is kept.
- A new walk has no revision to name and stays with create_city_walk; both
tool descriptions and the wiki say which is which.