Commit Graph

2 Commits

Author SHA1 Message Date
Maurice e4b990b75e ci(db): run the Postgres probe and lane on Postgres 14 and 18
TREK supports Postgres 14 to 18, and CI tested 17 only. One server-postgres
job per major now runs the probe and then the lane against the same service,
so the change keeps the job count of the two jobs it replaces. The lane's
global setup refuses a service whose major is not TREK_TEST_PG_MAJOR, and
the image's Postgres boot moves to 18, the major its client tools target.

scripts/ci/workflow-jobs.test.mjs fails when a job other than the scan is
missing from ci-ok's needs, and changed-areas pins that migrations,
repositories, the engine and the lane's files always run the job.
2026-11-17 12:04:45 +01:00
Isaias Tavares 526437926a test(db): run the suites that boot the app on Postgres in their own lane
npm run test:pg --workspace=server (vitest.pg.config.ts) runs every suite
that boots the app through buildApp() on the real database module against
Postgres, each test file on its own copy of one template database the
engine's bootstrap migrates once per run. TREK_TEST_DB_URL names the server;
without it the lane fails instead of passing on nothing. The CI job
'Server: Postgres Tests' runs it on a postgres:17 service and is part of
ci-ok.

tests/postgres/ holds what only Postgres needs proving:
- PARITY-PG: MikroORM's comparator finds nothing between the bootstrapped
  database and the entities. What it reports that changes nothing (key
  columns it would make nullable, defaults and checks Postgres spells its
  own way, the hand-ported triggers) is proven so: the spelling statements
  run in a rolled-back transaction and every default and check must read
  the same after, and every ported trigger must exist.
- the write lock: concurrent read-then-insert units of work never see the
  same count, and counts are numbers; a search ignores case.

tours-hike and tours-plan-types stay on SQLite only: they move a faked
setTimeout on until a tool call ends, which a database over the network
does not finish within.
2026-11-04 22:45:32 -03:00